From: route@monster.com
Sent: Monday, October 26, 2015 10:55 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: drive tseter
This resume has been forwarded to
you at the request of Monster User xapeix01
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Dexter Lovrien 1527 S. Cedar Drive Apache Junction, AZ
85120-8436 dexter2002@earthlink.net Cell Phone:
480-980-1763 EXPERIENCE 3/3/2014 - 4/5/2014Project
Resource Solutions LLC, Dawsonville, GA Field Engineer – ATT Spectrum
Clearing Project (OH, NC/SC & GA markets) * Re-cable and re-CAL SC-4812T
and ET sites acquired from AWCC/Alltel to ATT frequencies. * Retune 2:1 combiners as
required. 7/21/2013 - 2/7/2014 Samsung
Telecommunications America IMP Engineer – SPRINT Network
Vision project (Cleveland, Detroit, Pittsburgh mkts) * Install CAT-5 cables, configure
router and DU cabling. * Verify T1s at Telco box. * Load CSR router and DU shelves
with site specific software. * Verify proper operation of
alarm functions thru UDAs. * Make test calls on 1X, EVDO and
LTE to assure proper sector, p/n and speed test. * Clear alarms and trouble shoot
sites issues. * Document and photograph
progress. 10/29/2012 -
5/21/2013 FMHC Construction, (now Jacobs Engineering), Phoenix,
AZ Construction Manager –
NSN/T-Mobile LTE modernization project * Provide logistical support to
general contractors as needed. * RMA defective module, radios
and fibers. * Conduct site walks,
preconstruction meetings and post work inspections. * Represent FMHC on daily
supplier calls and weekly meetings. * Oversee completion of permits
& closeout documentation. * Commission, integrate &
call test 2G/3G & LTE sites when needed. Have PTID. 8/13/2012 - 10/20/2012
TechUSA, Charlotte, NC Field Service Engineer –
NSN/Verizon switch project * Install CAT-VE 6509 system in
new VZW Little Rock, AR switch facility * Bolt-down frames, terminate DC
power * Route and lace T3 coax.
Route, lace and terminate CAT6e cables * Route and install fiber cables * Install “toy cell” BTS frame 5/3/2012 - 7/3/2012
Skyhawk Wireless Staffing, Laguna Hills, CA Field Technician/Site Auditor –
NSN/T-Mobile project * Photograph existing site, BTS,
ancillary cabinets, feed-line and antenna/TMA details * Document existing tower &
ground space usage & availability * Prepare PowerPoint template
using site photos * Measure and prepare drawing of
complete site location * Populate .xls template with
antenna, TMA, SSC, BTS information and other details 5/10/2010 - 4/14/2012
Insight Global, Inc., Charlotte, NC Assistant Project Mgr – Nokia
Siemens Networks (NSN) – Verizon Carolinas acct team * Review weekly deployment list
and develop an efficient plan and schedule for install
crews to install Motorola SC-4812 BTS frames, EVDO upgrades and carrier adds * Train crews to assure
installation of BTS frames, upgrades & carrier adds meet NSN/Verizon
procedures and standards * Provide logistics support &
inventory tracking & control of spares, tools & expendables * Generate reports and map
overlays as required by project manager * Assist project manager with
other duties as required * Track scheduled and completed
work, escalating as needed. * Assist crews in locating cell
sites using Google Earth & Street Atlas 2010 PLUS * Maintain and update site
location spreadsheet as new sites added * Write installation manual to
assure all crews working to same standards * Assist warehouse liaison in
tracking BTS frames & kit inventory * Install SC4812 BTS & UBS
frames in DAS, special complex & high priority locations * Communicate daily status with
crew of +50, project management and counterparts 6/8/2009 - 3/31/2010
TEKsystems, Inc., Dallas, TX Field Technician – Clearwire’s
nationwide WiMax (4G) deployment * Install, configure and path
Dragonwave Duo microwave units * Respond to trouble tickets as
needed * Adjust electronic down-tilt
(RET) of antennas as needed * ATP & cluster drive test
using X-CAL, WiTT and DAPSAT software and procedures. * Install Valere rectifier &
battery string in new sites. * Assist Clearwire field techs,
rf engineers & tower crews as required. 1/28/2009 -
6/1/2009 C J Telecomm Inc., Los Angeles, CA Field Technician – Level 4 * Install Fujitsu 4100 router,
DSX panel, Valere rectifier & battery shelf in customer premises for ADC
COX/AT&T/VZW fiber project in Phoenix, AZ * Assist ADC leads with assorted
work at CO (fiber testing, duct install etc.) -- Level 2 10/6/2008 - 11/15/2008
C J Telecomm Inc., Los Angeles, CA Field Technician – Level 3 * Install CISCO 10K router
systems for ADC at Comcast head ends in Portland, OR area * Prepare, run & terminate 75
ohm coax, fiber, CAT5e & power cable. Sew & lace cables as
required to insure a neat, secure installation. * Inventory incoming parts
shipments 5/11/2008 - 9/13/2008
Solus Technical Resources, LLC., Woodstock, GA Lead Field Engineer * Led crew installing EVDO
expansion SC-4812T, MC & ET frames as part of Velocitel/Motorola project
for Verizon in North & South Carolina markets * Work involves bolt-down, power,
rf & router cabling. Also carrier adds at some sites * Provide daily reporting to
Velocitel & Motorola project managers. 3/2006 - 4/19/2008
InfraCell Inc., Tualatin, OR Assistant Project Manager * Led crews in deployment of EVDO
Rev. 0 & Rev. A, 2G to 3G packet upgrades, upgrading from Rev. 0 to Rev.
A & cable redress projects in many ALLTEL markets. * Work included installation of
expansion SC-4812MC frames in some markets. * Assured crew was supplied with
proper tools, test gear (8921A, HP435B power meter, El Gato test set) &
market specific access information. * Provided daily status reporting
to Motorola & Alltel management. * Maintained inventory records of
project materials/kits. * Worked with Motorola Project
mgmt & Alltel market to schedule deployment of upgrade with as little
impact as possible on market operations. * First point of contact for
field crew, Alltel field techs & Motorola project management. * Worked with senior Motorola BTS
Engineers in development, refinement and dissemination of many MOPs,
procedures & training of field crews. 1/2005 - 12/2005 InfraCell
Inc., Tualatin, OR Cellular Field Engineer * Installed EVDO upgrade on
SPRINT Wireless SC-4812, ET, ET Lite & 480 sites. * Loaded MCC-DO cards with code
and SPA data using LMT. * Installed additional carrier
hardware as needed for EVDO carrier. * Loaded & calibrated BTS
frames using WinLMF & CyberTest following upgrade. * Performed EBR to IBR procedure
as required for EVDO upgrade on ET Lites. * Tested and documented
performance of EVDO carrier using CAIT & SCFT procedure. * Hot-swap SC-4812 ET in place of
ET Lite to increase capacity & add EVDO carrier. * Troubleshot SPAN, CSU &
associated components to assure proper EVDO operation. * Assisted MOTOROLA field &
system engineering to meet customer requirements. * Interfaced with MOTOROLA CBSC
& Sprint Switch and NOC personnel. 10/2004 -12/2004 InfraCell
Inc., Tualatin, OR EVDO Drive Test Team * Supported MOTOROLA system
engineering team with drive testing during FOA deployment of EVDO system for
Verizon Wireless. * Collected EVDO performance data
using CAIT & SCFT (Single Cell Functionality Test) procedures were
developed and refined. * Assisted in the development of
the SCFT procedure, generate drive test routes & determine metric test
locations. 2/2004 - 10/2004 InfraCell
Inc., Tualatin, OR Cellular Field Engineer * Replaced CISCO routers
(warrantee issue) of Verizon's N/S Carolina markets * Installed SC-4812T starter
& expansion frames (including bolt-down, power & rf) * Completed "punch
list" items to meet customer expectations. * Assisted Motorola and Verizon
engineers as required to complete sites on schedule. 11/2003 - 12/2003 VariTech
Sicklerville, New Jersey Quality Assurance Auditor * Working with a tower climber,
photographed and documented existing state of Cingular cell sites in west
Texas following the installation of GSM frames. * Noted deficiencies in
weatherproofing, improper color coding of rf cables, inadequate ground
systems, azimuth, mechanical & electrical down tilt of antennas etc.
compared with customer’s current site documentation. Noted structural
or site issues. 2/2003 - 8/2003 OXFORD
GLOBAL RESOURCES, Beverly, MA Cellular Field Engineer * Installed CISCO routers to
facilitate 3G upgrade of Verizon's N/S Carolina markets * Installed SC-4812T starter
& expansion frames (including bolt-down, power & rf) * Completed "punch
list" items to meet customer expectations. * Assisted Motorola and Verizon
engineers as required to complete sites on schedule. 12/2000 - 8/2002 MOTOROLA
Schaumburg, ILL Field Engineer * Performed 2nd carrier 1X 3G
up-grades in New Orleans and Killeen-Temple-Waco markets adding much needed
capacity. Met customer expectations and schedule. * Completed final installation
and up-grades, loaded software, calibration, optimization and acceptance
testing of SC-4812 family of cellular base stations in Southwest ALLTEL
markets. Adding needed capacity and expandability to ever growing
cellular system. * Developed proposal for RF
propagation testing to aid system engineers in the location of future cell
sites. * Assisted fellow CFEs with the
installation and commissioning of new switching systems and system
expansions. Meeting customer deadline and adding much needed system
capacity. 8/1996 - 12/2000 KELLY
SERVICES, Tempe, AZ Drive Test Team member contracted
to MOTOROLA, Phoenix, * Collected and processed CDMA
system performance data for review by MOTOROLA and CellularONE/ALLTEL system
engineers. * Trained new drive team members. 11/1996 - 4/1997
National Mobile Television, Torrance, CA “A-2” Audio crewman * Assisted “A-1” Senior Audio
Operator with production of Phoenix Coyotes professional hockey and preseason
baseball games. 8/1980 - 8/1996 KAAL TV-6,
Austin, MN Broadcast Engineer/ENG van
operator * Operated and maintained Master
Control. Trained new Master Control operators. * Operated and maintained 2 Ghz
"LIVE NEWS" (ENG) van. Trained new van operators. * Generated and maintained
stations CAD drawings & oversaw PCB board development. * Served as EIC (Engineer in
Charge) of multi camera field production truck. * Assisted in the design,
development and construction of the ENG van, field production truck, 2
generations of automated commercial playback system and other projects. 6/1969 - 6/1980 RADIO
SHACK, Ft. Worth, TX Assistant District Manager, Store
Manager, Assistant Store Manager, Salesman * Set-up stores, trained sales
force and opened dozens of new stores in upper Midwest as company grew from
375 to +11,000 retail stores. EDUCATION 5/1982 Austin Area Vo/Tech
Institute (now Riverland Community College), Austin, MN 2 year course in basic
electronics as applied to color television broadcasting and reception.
Graduated with Certificate of Occupational Proficiency in Color Television
Technology (May 1982) 5/1969 O'Gorman High School,
Sioux Falls, SD General studies w/year-long, 1/2
day course in TV Production/Direction in senior year. AFFILIATIONS 8/1986 - 7/1996 Boy Scouts of
America as Scoutmaster, District Commissioner & several other roles
within the Spamland District of the Twin Valley Council (Mankato, MN) 1989 - Asst Scoutmaster -
National Scout Jamboree 1993 - Scoutmaster - National
Scout Jamboree 1993 - District Award of Merit -
Spamland District, Twin Valley Council (Mankato, MN) COURSES BTS610 SC-4812ET CDMA Base
Transceiver Station (Trunked) 1/14/2005 PPC RP-210 w/ SP-½-UNIVD press
frame crimp tool for ½” SUPERFLEX rf cable NSN Flexi-Radio 2G/3G & LTE
Installation/Commissioning/Integration 2012-13 LICENSES/CERTIFICATIONS FCC General Radiotelephone
Operator issued: 1/2/1985 expires: n/a (lifetime) PTID NSN/T-Mobile Flexi 2G/3G
& LTE OSHA 10 hour SKILLS Skill Level Last Used Experience
PPC connectors (1/2” N & DIN)20122
years X-CalIntermediate2010
1 year DapSatIntermediate
2010
1 year WiTTIntermediate2010
1 year WiMaxIntermediate2010
1 year LMF
Advanced 2008 8 years SC-4812 BTS familyAdvanced 2014
14 years Tech writing Intermediate 2013
17 years CDMA 3G Advanced 2014
12 years LMTAdvanced 20082 years CAIT Advanced 2006 2 years EVDO Advanced 2014 8
years Agilent E7495AAdvanced2014 6
years MapInfoIntermediate20004 years NSN
Flexi-Radio
Intermediate 2013
7 months Samsung 2/3G & LTE
Intermediate
2014
7 months References available upon request |
|
|
||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||